Due to construction work in the Simplon Tunnel, there will be a complete closure between 16 August and 5 September 2020. During this time the Rolling Highway will not circulate.

Starting from 6 September 2020 the Rolling Highway will again circulate according to the timetable.

online reservation request


Simply book online.

BOOK NOW

RESERVATIONS – TERMS AND CONDITIONS

  1. Prices excl. VAT
  2. Supplement for carriage of Hazardous Goods (ADR) / second driver


When reserving provide details of:
  • Weight / length
    42 t / 18.60 m to max. 44 t / 19.00 m
  • Hazardous Goods
    Several days' advance notification required for certain Class 1 UN numbers (e.g. pyrotechnic products and munitions)
  • Unladen trucks
    Prices for laden trucks apply unless otherwise indicated. Unladen trucks are accepted for carriage only in the event of spare capacity or if confirmed by RAlpin.
  • Accompanying persons with valid truck driving licences
TIMETABLE
GTCs
CONDITIONS OF CARRIAGE

THROUGH SWITZERLAND IN EIGHT STEPS